District 10 allocated $200,000* (annually) from Department of Transportation for pedestrian safety and traffic calming.
Install Speed Humps Hampton Dr.
Project collected enough "yes" signatures to move forward. DOT is wrapping up the design for the speed humps.
Install Speed Humps On Elwood Rd.
Project collected enough "yes" signatures to move forward. DOT is wrapping up the design for the speed humps.
Install Speed Humps On Choctaw Dr.
DOT is calculating the number of "yes" signatures that are needed for the project to move forward
Paint High Visibility Crosswalks Around Schools
Completed at Los Paseos Elementary and Murphy Middle school.
Edgelines
Elwood Center - completed
La Estrada Dr. - completed
Decorated Street Lights Conversion
Over 130 Decorative Lights in District 10 will be converted Light Emitting Diodes (LEDs) by the end of 2023.
LEDs to be changed from a Cap Fixture to an Open Fixture.
Changes will be made to:
Almaden Valley (122)
Bayliss Dr (7)
Coleman Valley (5)
Manila Ave (3)
Completion date by end of 2023
Additional Traffic Calming Modifications On Via Valiente
Completed:
All proposed High visibility crosswalks- Via Valiente & Camden Ave; Via Valiente and Bret Harte Dr.;
Serentity/McCall- Edgelines/striping to visually narrow lane
Via Valiente/Bret Harte Dr- yellow reflective tape on signals (funded by OTS)
In progress:
Botts dots in centerline
High visibility crosswalks- Via Valiente & Almaden Expressway
Holy Spirit Crosswalk
Proposed crosswalk at Redmond and Moss Oak, in front of the Holy Spirit School.
Design is in progress
Camden / Graystone (Los Alametos Creek Trail)
Enhanced crosswalk with flashing beacons and curb extensions at trail crossing on Graystone, north of the intersection. Modify free-right turn lane at the intersection to slow right turn drivers - Finalizing Design
Camden / Creekview
One Radar sign placed in Westbound direction- Design in progress
Sideshow Deterrents
Staff checked in with Captain Donohue about other potential sideshow locations. Two new locations were sent to DOT . DOT will now conduct a field visit at proposed locations.
Akio/Winterset & Akio/Trinidad
Funds rolled over from previous councilmembers
Bernal Soundwall Extension
Project is now located in D10 after redistricting and initial funding was allocated to D2 Council Office